[1]
2025. Optimization Method for Cross-Regional Scheduling of Retired Charging Pile Component Reuse. International Journal of Engineering and Technology Innovation. 15, 4 (Oct. 2025), 488–505. DOI:https://doi.org/10.46604/ijeti.2025.15250.