[1]
Xie, W., Hicks, C. and Pongcharoen, P. 2014. A Multiple Criteria Genetic Algorithm Scheduling Tool for Production Scheduling in the Capital Goods Industry.
International Journal of Engineering and Technology Innovation
. 4, 1 (Jan. 2014), 18–29.