A Multiple Criteria Genetic Algorithm Scheduling Tool for Production Scheduling in the Capital Goods Industry. (2014). International Journal of Engineering and Technology Innovation, 4(1), 18-29. https://ojs.imeti.org/index.php/IJETI/article/view/126