Kumara, S. (2017). Simulated Energy Production and Performance Ratio of 5 MW Grid-Connected Photovoltaic under Tropical Savannah Climate in Kupang Timor Island of Indonesia. International Journal of Engineering and Technology Innovation, 7(2), 117–129. Retrieved from https://ojs.imeti.org/index.php/IJETI/article/view/181