“A Multiple Criteria Genetic Algorithm Scheduling Tool for Production Scheduling in the Capital Goods Industry” (2014) International Journal of Engineering and Technology Innovation, 4(1), pp. 18–29. Available at: https://ojs.imeti.org/index.php/IJETI/article/view/126 (Accessed: 15 October 2026).