[1]
W. Xie, C. Hicks, and P. Pongcharoen, “A Multiple Criteria Genetic Algorithm Scheduling Tool for Production Scheduling in the Capital Goods Industry”,
Int. j. eng. technol. innov.
, vol. 4, no. 1, pp. 18–29, Jan. 2014.