Transmission Wheeling Pricing in Embedded Cost Using Modified Amp-Mile and MVA Utility Factor Methods
Keywords:
Transmission wheeling pricing, Embedded Cost Recovery, Open access, Power system economicsAbstract
Transmission wheeling pricing is one of the decisive aspects of present open access electricity market. Various methods are available for transmission; however, no method is proved to diverse operating conditions of power system. These methods are not able to quantify the full recovery of embedded cost. All the variables i.e. remaining charges, used circuit capacity are not counted in the existing methods. This Paper explicates two methods, Modified Amp – Mile method and MVA Utility Factor method, to recover embedded cost. Modified Amp-Mile method is customized form of existing Amp-Mile method. In the MVA Utility Factor method, cost allocation is based on marginal participation (MP). It evaluates the cost, using sensitivity analysis of network power. The proposed methods are tested on an IEEE 6 bus system and further verified on Hadoti region real 37 bus system. All the results are presented in Full Recovery Model (FRM) and Partial Recovery Model (PRM).
Published
How to Cite
Issue
Section
License
Submission of a manuscript implies: that the work described has not been published before that it is not under consideration for publication elsewhere; that if and when the manuscript is accepted for publication. Authors can retain copyright in their articles with no restrictions. is accepted for publication. Authors can retain copyright of their article with no restrictions.
Since Jan. 01, 2019, AITI will publish new articles with Creative Commons Attribution Non-Commercial License, under The Creative Commons Attribution Non-Commercial 4.0 International (CC BY-NC 4.0) License.
The Creative Commons Attribution Non-Commercial (CC-BY-NC) License permits use, distribution and reproduction in any medium, provided the original work is properly cited and is not used for commercial purposes.